How simple upgrades can make a huge impact to your centre
Location: Loganholme, QLD, AUS
Size: Approx 200 m²
Timeframe: 2 weeks
– Remove large tyres
– Repaint old tyres from black to white
And as a bonus the boys fixed up the stepping stone area:
– removing and fixing any logs that had chips or that were
rotten – to make safe,
– re-stained stepping logs, placed them a way so they could
race each other in two straight rows
– Added new sand
Fresh Paint
We can’t stress enough how painting something can freshen up even the oldest looking part of your back yard
Sand/Bark Top Up
A fresh refill or top up of your bark and sand pit can make all the difference to the eye of the beholder – not to mention is safer for the children
Refresh & Rearrange
– Repaint of bathroom walls, ceiling and doors
– Removal of old wall hung cabinetry and sinks
and install new Bathroom cabinetry
– Relocation of plumbing for hand basins
– Installation of new basins and tap ware
– Replacing vinyl flooring
– Installing new toilets