Loganholme Playground & Bathroom Upgrade
A bathroom and playground upgrade to be desired. See the transformation here
Project Details
Location: Loganholme, QLD, AUS
Size: Approx. 200 m²
Timeframe: 2 weeks
External – Playground Upgrade
And as a bonus the boys fixed up the stepping stone area:
- Removing and fixing any logs that had chips or that were rotten – to make safe, re-stained stepping logs, placed them a way so they could race each other in two straight rows
- Added new sand
An amazing result, looks completely transformed from what it was. The children are being very respectful of their own environment as they practice health and hygiene
~ Karlien Kerr – Centre Director
Before & After
Bathroom Renovation
The centre had two bathrooms to renovate, one in the babies area which they had a basin within a basin, bright yellow walls and old fixtures and cabenetry.
The other was for their kindy aged children with 6 toilets and a long basin.
We were required to:
- Remove existing bathroom fixtures, cabinetry and flooring
- Re-configure existing plumbing
- Lay new vinyl flooring
- Paint walls
- Install new bathroom fixtures and cabinetry